Below are list of our major projects;
Project Name | Client | Year |
Perwaja Steel,DRI 40 tube Replacement + VO | Perwaja | 2013 |
PCESB, 3 Furnace Recoiling | PCESB | 2013 |
Perwaja Steel,DRI tube scrap buy back | PM Steel | 2013 |
Convection tube sheet replacement for F-106 | PCESB | 2013 |
Air Product-Kulim , Tank Repair | Air Product | 2013 |
PCESB, Filler Supply (UTP A2535Nb) | PCESB | 2013 |
Furnace Roof replacement and insulation | PCESB | 2014 |
To Repair Coil Clogged at F104 | PCESB | 2014 |
Tube sheet plate | PCESB | 2014 |
PCESB TA 2014 Emergent Job | PCESB | 2014 |
PCESB Furnace Major Rectification Work-LMP | PCESB | 2014 |
Supply of Metrode 62-50 MIG ERNi-CrMo-3 15kg | Air Product | 2014 |
Reformer Tube Installation | PT. Ecogreen Oleochemicals | 2014 |
Provision of Manpower, Supervision, Tools, Equipment, Material and Consumables for S-704 Flare Repair | GPP 1, GAS PROCESSING PLANT KERTIH, KERTIH, TERENGGANU DARUL IMAN | 2016 |
Provision of Manpower, Supervision, Tools, Equipment, Material and Consumables for DED Draft Pressure Control System | PETRONAS CHEMICAL ETYLENE (PCESB) , KERTIH, TERENGGANU DARUL IMAN | 2016 |
Provision of Manpower, Equipments and Consumables and Perform Existing Superheater Removal by Flanges Disconnection and Cutting, Erection of New Superheater with Proper Supports, Leveling, Salt Inlet & Outlet Duct Welding and Steam Inlet & Outlet Duct Welding and Steam Inlet and Outlet Flages Welding and Boxing Up Jobs | ORGANICS OPTIMISTIC SDN BHD | 2016 |
Provision of Manpower, Supervision, Tools, Equipment, Material and Consumables for Replace Reformer |
PT. ECOGREEN OLEOCHEMICALS, |
2016 |